|
建筑物的电气装置.第5-53部分:电气设备的选择和安装.绝缘、开关和控制
Electrical installations of buildings - Part 5-53: Selection and erection of electrical equipment; Isolation, switching and control
参考页数:36P.;A4
|
|
|
|
|
|
电气装置用电缆中继系统和电缆管道系统. 第2-2部分: 详细要求. 用于安装在地板下方, 地板或地板上方的电缆中继系统和电缆管道系统
Cable trunking systems and cable ducting systems for electrical installations - Part 2-2: Particular requirements - Cable trunking systems and cable ducting systems intended for mounting underfloor, flushfloor, or onfloor
参考页数:62P.;A4
|
|
|
|
|
|
低压电气设施.第7-704部分:特殊设施或场所的要求.建筑和拆除工地的设施
Low voltage electrical installations - Part 7-704: Requirements for special installations or locations - Construction and demolition site installations
参考页数:15P.;A4
|
|
|
|
|
|
低压电气设施.第6部分:检验
Low voltage electrical installations - Part 6: Verification
参考页数:100P.;A4
|
|
|
|
|
|
建筑物的电气设施.第5-55部分:电气设备的选择和安装.其他设备.修改件2
Electrical installations of buildings - Part 5-55: Selection and erection of electrical equipment - Other equipment; Amendment 2
参考页数:2P.;A4
|
|
|
|
|
|
建筑物的电气设施.第5-55部分:电气设备的选择和安装.其他设备
Electrical installations of buildings - Part 5-55: Selection and erection of electrical equipment - Other equipment
参考页数:146P.;A4
|
|
|
|
|
|
通用布线系统. 依据ISO/IEC 11801的平衡通信电缆的试验规范. 第2-25部分: M12 4极连接器的工作区域. 空白详细规格
Generic cabling systems - Specification for the testing of balanced communication cabling in accordance with ISO/IEC 11801 - Part 2-25: Work area with M12 4 poles connectors - Blank detail specification
参考页数:10P.;A4
|
|
|
|
|
|
建筑物的电气装置.第5-53部分:电气设备的选择和安装.绝缘、开关和控制
Electrical installations of buildings - Part 5-53: Selection and erection of electrical equipment - Isolation, switching and control
参考页数:250P.;A4
|
|
|
|
|
|
在建筑和工程结构中电气配线和规划图表用图形符号
Graphic Symbols for Electrical Wiring and Layout Diagrams Used in Architecture and Building Construction
参考页数:42P.;A4
|
|
|
|
|
|
石化工业用绝缘电力电缆的安装、端接和试验推荐规程
Recommended Practice for Installation@ Termination@ and Testing of Insulated Power Cable as Used in Industrial and Commercial Applications
参考页数:34P.;A4
|
|
|
|
|