|
轨道交通.轨道.铁路侧线和道岔口.第4部分:驱动、锁紧和检测
Railway applications - Track - Switches and crossings - Part 4 : actuation, locking and detection.
参考页数:5P;A4
|
|
|
|
|
|
轨道交通.铁轨.开关和道岔.第9部分:规划
Railway applications - Track - Switches and crossings - Part 9 : layouts.
参考页数:6P;A4
|
|
|
|
|
|
轨道交通.轨道.铁路侧线和道岔口.第6部分:固定普通和钝角岔道
Railway applications - Track - Switches and crossings - Part 6 : fixed common and obtuse crossings.
参考页数:5P;A4
|
|
|
|
|
|
|
|
合金钢组合辙叉
Alloy steel combined frogs
价格:¥0.00
|
|
|
|
|
|
铁路道岔型号编制方法
Draw up method for turnouts
价格:¥0.00
|
|
|
|
|
|
高速铁路扣件系统试验方法 第7部分:预埋件抗拔力试验
Test methods for fastening systems of high-speed railway.Part 7:Vertical load test for cast-in fastening components
价格:¥0.00
|
|
|
|
|
|
高速铁路扣件系统试验方法 第6部分:恶劣环境条件的影响
Test methods for fastening systems of high-speed railway.Part 6:Effect of severe environmental conditions
价格:¥0.00
|
|
|
|
|
|
高速铁路扣件系统试验方法 第5部分:绝缘电阻的测定
Test methods for fastening systems of high-speed railway.Part 5:Determination of electrical resistance
价格:¥0.00
|
|
|
|
|
|
高速铁路扣件系统试验方法 第4部分:组装疲劳性能试验
Test methods for fastening systems of high-speed railway.Part 4:Test of fatigue performance of fastening assembly
价格:¥0.00
|
|
|
|
|