|
铁路调车作业 第4部分:简易驼峰作业
The operating for railway shunting--Part 4:Operating for the simple hump
价格:¥0.00
|
|
|
|
|
|
铁路调车作业 第3部分:半自动化驼峰作业
The operating for railway shunting--Part 3:Operating for the mechanized hump
价格:¥0.00
|
|
|
|
|
|
铁路调车作业 第2部分:准备作业
The operating for railway shunting--Part 2:Preparing operation
价格:¥0.00
|
|
|
|
|
|
铁路调车作业 第10部分:自动化驼峰作业
The operating for railway shunting--Part 10:Operating for the auto-hump
价格:¥0.00
|
|
|
|
|
|
铁路调车作业 第1部分:基本规定
The operating for railway shunting--Part 1:Basic regulations
价格:¥0.00
|
|
|
|
|
|
铁路区间道口信号设备技术条件
Technical specification for crossing signal equipment in wayside
价格:¥0.00
|
|
|
|
|
|
铁路站内道口信号设备技术条件
Technical specification for crossing signal equipment within the station
价格:¥0.00
|
|
|
|
|
|
|
|
铁路编组站改编能力计算方法(三级三场)
Calculated methods of sorting capacity for railway marshalling station(3-stage/3-yard)
价格:¥0.00
|
|
|
|
|
|
铁路货运术语
Terminology for railway freight traffic
价格:¥0.00
|
|
|
|
|