|
水电水利工程沉沙池设计规范
Specifications on designing sand basin of hydropower and water conservancy projects(explanation)
参考页数:19P.;A4
|
|
|
|
|
|
|
|
|
|
防护大坝.要求和试验方法
Prophylactic dams. Requirements and test methods
参考页数:40P;A4
|
|
|
|
|
|
材料对人类用水的影响.由迁移造成的影响.非金属无粘性的现场使用材料的试验方法
Influence of materials on water intended for human consumption - Influence due to migration - Test method for non-metallic and non-cementitious site-applied materials
参考页数:32P;A4
|
|
|
|
|
|
水力机械(水轮机、蓄水泵和水轮泵)振动和脉动现场测量指南
Guide for field measurement of vibrations and pulsations in hydraulic machines (turbines, storage pumps and pump-turbines)
参考页数:76P.;A4
|
|
|
|
|
|
水和其他液体流动设备用闸门.规范
Penstocks for use in water and other liquid flow applications - Specification
参考页数:22P.;A4
|
|
|
|
|
|
水文测量.大河和洪水流量的野外测量
Hydrometry - Field measurement of discharge in large rivers and rivers in flood
参考页数:16P;A4
|
|
|
|
|
|
土工合成垫. 用于水库和水坝建筑的特征要求; 德文版本EN 13361-2013
Geosynthetic barriers - Characteristics required for use in the construction of reservoirs and dams; German version EN 13361:2013
参考页数:45P.;A4
|
|
|
|
|
|
电动自动控制的通信网络和系统.第7-410部分:基本通信结构.水力发电站.监测和控制用通信(IEC 61850-7-410-2012).英文版本EN 61850-7-410-2013
Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control (IEC 61850-7-410:2012); English version EN 61850-7-410:2013
参考页数:61P.;A4
|
|
|
|
|