|
采用蒸气压力数据计算汽化热或蒸馏热的标准实践规程
Standard Practice for Calculating Heat of Vaporization or Sublimation from Vapor Pressure Data
参考页数:4P.;A4
|
|
|
|
|
|
采用蒸气压力数据计算汽化热或蒸馏热的标准实践规程
Standard Practice for Calculating Heat of Vaporization or Sublimation from Vapor Pressure Data
参考页数:4P.;A4
|
|
|
|
|
|
石油、石油化学和天然气工业.专用汽轮机设备
Petroleum, petrochemical and natural gas industries - Steam turbines - Special-purpose applications
参考页数:113P;A4
|
|
|
|
|
|
燃气轮机.采购.第7部分:技术信息
Gas turbines - Procurement - Part 7: Technical information
参考页数:16P.;A4
|
|
|
|
|
|
燃气轮机.验收试验
Gas turbines - Acceptance tests
参考页数:106P;A4
|
|
|
|
|
|
机械振动. 机械振动的测量和评估. 第2部分:陆基燃气轮机、蒸汽轮机和超过40mw的发电机,带有油膜轴承,额定转速为1500 r / min、1800 r / min、3000 r / min和3600 r / min
Mechanical vibration - Measurement and evaluation of machine vibration - Part 2: Land-based gas turbines, steam turbines and generators in excess of 40 MW, with fluid-film bearings and rated speeds of 1500 r/min, 1800 r/min, 3000 r/min and 3600 r/min
参考页数:23P.;A4
|
|
|
|
|
|
联合发电系统.规划、评估和采购用技术申报
Cogeneration systems - Technical declarations for planning, evaluation and procurement
参考页数:32P.;A4
|
|
|
|
|
|
燃气轮机设施.安全性
Gas turbine applications - Safety
参考页数:82P;A4
|
|
|
|
|
|
燃气轮机.采购.第3部分:设计要求
Gas turbines - Procurement - Part 3: Design requirements
参考页数:63P;A4
|
|
|
|
|
|
燃气轮机.采购.第9部分:可靠性、可用性、可维修性和安全性
Gas turbines - Procurement - Part 9: Reliability, availability, maintainability and safety
参考页数:25P;A4
|
|
|
|
|