| 标准号: |
GB/T 18134.1-2000 |
| 英文名称: |
High-voltage testing techniques with very fast impulses Part 1: Measuring systems for very fast front overvoltages generated in gas-insulated substations |
| 中标分类: |
电工>>输变电设备综合 |
| 发布日期: |
2000-07-14 |
| 发布单位: |
CN-GB |
| 标准状态: |
请与本站工作人员进行确认 |
| 实施日期: |
2000-12-01 |
| ICS分类: |
电工和电子试验>>电工和电子试验 |
| 起草单位/标准公告: |
西安高压电器研究所 |
| ***: |
CF |
| ***: |
B |
| 正文语言: |
汉语 |
| 页数: |
20P.;A4 |
| 采用关系: |
IEC 61321-1-1994,IDT |
| 内容提要(CN): |
高电压;变电站;仪表;电压;绝缘;气体;测量;试验;电力传输 |
| 内容提要(EN): |
voltage;testing;testing;testing;examination;insulating;transformer stations;testing;testing;measuring;electric power transmission;meters;trials;measurements;high voltage;tests;insulation;gas;electric substations;measurement;gases;insulation (electrical);highvoltage;test;insulations |
| 归属: |
中国 |
|